Fiber Musings

Random thoughts of a fiber enthusiast - mostly fiber related, sometimes coherent

2013 Spring Cleaning #5

Fleeces. I’ve got fleeces.

All the ones that I intended to send out for processing have been sent and returned. I still have several that I had set aside for hand processing. Majority of these are not yet scoured. I need to use the warm weather to sort and scour them. I don’t have to process them, but I need to get them washed and sorted.

Decision

Summer project.

2013 Spring Cleaning #4 Update

col_blocking

blocking in the hotel room

I just realized that I never published any photos of the pre-finished shawl on the blog!

Sorry about the horrid picture. I finished the last of the knitting on the plane to and at SOAR. I ran back to the room between evening events to block the shawl the night before I had to turn it in. So not only was this photo taken on my phone, it was in a dimly lit hotel room.

Good thing I had a large room to myself, even if it was covered in mold and mildew. (It was a fun asthma filled week.)

A big thank you to Jen for bringing her blocking wires for me. I didn’t want to fly with mine.

col_soar2011

SOAR 2011 Gallery

2013 Spring Cleaning #4

Circle of Life Shawl. The edging is still not done. I am mostly through section 2…of 8.

Decision

Keep Knitting!

I am vested in this project. I’ve just been too tired at night to work on lace these days. I need to set aside some time each week to work on it. I want it finished by fall.

Page 46 of 271

Powered by WordPress & Theme by Anders Norén